    Referenz: 20020264
    Veröffentlichungsdatum: 7 November 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    Union Fenosa Distribución, SA and dependent group companies engaged in electricity distribution activities; or Acceptable bank(s) in case of bank(s) intermediation.

    Ort

    Beschreibung

    Reinforcement and extension of the electricity sub transmission and distribution network in 4 Spanish regions. The project comprises a large number of geographically dispersed schemes on the promoter’s distribution networks (220 KV to low tension). The project is part of the promoter’s 2006-2008 ongoing capital spending programme in electricity distribution facilities and includes the study, design, supply, erection and commissioning of substations, overhead lines, underground cables, meters, as well as improvements of regional network operation and control centres.

    Ziele

    The project will increase capacity to cater for growing electricity demand, improve the quality and reliability of supply, reduce technical losses and fulfil legal and regulatory requirements.

    Kommentar(e)

    Electricity distribution.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 38% of project cost.

    Gesamtkosten (voraussichtlicher Betrag)

    Approximately EUR 706 million.

    Umweltaspekte

    A small portion of schemes fall under Annex I and Annex II of the EU Environmental Directive and is subject to Environmental Impact Assessment. The promoter submits the investment proposals on a regular basis to the competent authorities.

    Auftragsvergabe

    The investments are subject to Procurement Directive 2004/17/EC. The promoter has confirmed that procurement procedures applied to the project will be in line with the directive’s requirements, including regular publications in the Official Journal of the EU and the National Official Journal (BOE).

    Projektstatus

    Unterzeichnet - 28/02/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Spanien Energie