Veröffentlichungsdatum: 26 März 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Private owner and operator of 21 hospitals in Germany and Austria.Ort
Beschreibung
The project comprises the construction of two new private acute hospitals (Müllheim and Schkeuditz) and the upgrading / refurbishing of additional four facilities, including medical equipment and information technology.
Ziele
The project objective is to achieve economic solutions allowing cost savings in hospital operations by removing unfavourable building structures and configurations, with the result of improving the qualitative medical care in the hospitals' catchment area.
Kommentar(e)
Hospital activities.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 50m
Gesamtkosten (voraussichtlicher Betrag)
Up to EUR 133.5m
Umweltaspekte
Healthcare facilities do usually not generate significant environmental impact, however contaminated waste will be adequately treated. Although Directive 97/11/EC does not specifically mention hospitals, it could be relevant in case the new or rehabilitated hospital buildings were located in urban areas. It is unlikely that an EIA will be required but this will be verified during appraisal.
Auftragsvergabe
Procurement procedures applied by the promoter are in compliance with Council Directives applicable to public authorities procurement and national legislation.
Projektstatus
Unterzeichnet - 23/08/2004
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).