Veröffentlichungsdatum: 28 April 2003
Projektträger – zwischengeschaltetes Finanzinstitut
SWAZILAND ELECTRICITY BOARD
P.O. Box 258
Mbabane
Swaziland
Ort
Beschreibung
The purpose of the project is to utilise the hydroelectric potential from a large recently constructed irrigation dam, thereby providing additional domestic electricity production capacity, partly during peak hours, to the power system. The project is located on the Komati River, near the town of Pigg’s Peak in northwestern Swaziland.
Ziele
To reduce Swaziland’s dependence on power imports, as well as assisting in developing renewable energy resources.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 7m
Umweltaspekte
A Comprehensive Mitigation Plan was established and implemented for the construction of the dam itself, which included public consultation, resettlement and substantial compensation to the people affected. The incremental environmental impact of the hydropower project is considered very limited, with any necessary mitigation measures being taken. Compliance Certificates will be issued by the Swaziland Environment Authority once these measures are implemented.
Auftragsvergabe
The project will be subject to international bidding published in the Official Journal of the EC in accordance with the Bank’s rules.
Projektstatus
Unterzeichnet - 18/06/2003
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).