    Übersicht

    Veröffentlichungsdatum
    9 Juni 2023
    Projektstatus
    Referenz
    In Prüfung | 03/06/2022
    20210433
    Projekttitel
    Projektträger – Finanzintermediär
    GUINEA-BISSAU TAH-7 RESILIENT ROAD CORRIDOR
    REPUBLIQUE DE GUINEE-BISSAU
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    EUR 85 million
    EUR 170 million
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project will finance the rehabilitation and climate change resilience enhancement of the N2 highway between Safim and Mpack (115 km), corresponding to a section of the Dakar-Lagos Trans-African Highway corridor No.7 (TAH-7). More specifically, this includes widening the existing road to accommodate hard shoulders, as well as the rehabilitation of two major and five minor bridges. The EIB loan will support road rehabilitation works on the approximately 65 km-long section, starting from PK45 close to village of d'Antotinha to the M'Pack border crossing.

    As part of the EU's Global Gateway strategy, this project will bring significant improvements in the country, such as increased mobility and safety, better access to trade and economic activities, as well as essential services. The project will also promote regional integration, enhancing Guinea-Bissau's potential to trade with neighbouring countries and within the wider West African market. Additionally, it will benefit through economies of scale from an expanded market in an integrated African economy under the African Continental Free Trade Area (AfCFTA) which entered into force on 1 January 2021. As a strategic regional corridor, the project is supported by the EU under its Multi-Annual Indicative Programme for Sub-Saharan Africa (2021-2027). The project also forms part of the EU Global Gateway strategic corridor Praia/Dakar-Abidjan, identified under the 2nd Priority Action Plan of the Programme for Infrastructure Development in Africa (PIDA PAP 2). The project will contribute to the following Sustainable Development Goals (SDGs): SDG 9 (Industry, Innovation and Infrastructure), SDG 13 (Climate Action), as well as SDG 1 (reducing poverty), SDG 5 (gender equality), SDG 8 (providing decent work and economic growth) and SDG 17 (partnership and goals).

    Umweltaspekte
    Auftragsvergabe

    If located within the EU, the project would fall under Annex II of environmental impact assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU and would therefore be subject to screening by the competent authority to determine whether an EIA was required. The project is, in any case, categorised as requiring a full EIA under applicable domestic legislation, Law 10/2010 of 24 September (Lei de Avaliação Ambiental) setting general principles for the EIA procedure. Therefore, an EIA procedure, in accordance with applicable standards, needs to be undertaken and submitted to the Competent Authority for approval. The Bank will check the environmental and social aspects during appraisal and verify that the Promoter has complied with the relevant EU principles and the EIB Environmental and Social Standards.

    The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. In particular, the Bank will require that calls for international tenders will be published in the OJEU.

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen