Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090238
    Veröffentlichungsdatum: 10 März 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Syndicat des Transports d’Ile de France (STIF)

    Ort

    Beschreibung

    The project consists of the modernisation of the rolling stock operated in the Ile-de-France region on commuter lines. It is composed of three elements: acquisition of 172 new electric trains (NAT), acquisition of 24 new hybrid Autorail trains (AGC) and refurbishment of 635 units Z2N type train cars.

    Ziele

    The Project should contribute to alleviate present and future traffic problems around the Region Ile-de-France and, consequently, improve the quality of the urban and regional environment. It aims at increasing public transport efficiency, reliability and service comfort.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Maximum EUR 500 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 2 000 million.

    Umweltaspekte

    The construction of the new train sets will take place in the manufacturer’s plants and does not fall within the scope of Directive 85/337/EEC (as amended); neither does the implementation by the Promoter, therefore no EIA is required for the project.

    The project can be expected to contribute to an overall improvement of the urban and regional environment by encouraging the use of public transport in a congested urban area, also partially reducing private car usage.

    Auftragsvergabe

    The Promoter is subject to and follows EU procurement procedures, including publication in the EU Official Journal. According to the received information all tendered contracts are in compliance with the EU Directives on procurement. Under these conditions, the procedures adopted for the project are suitable and acceptable to the Bank.

    Projektstatus

    Unterzeichnet - 20/01/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Frankreich Verkehr