Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20180047
    Veröffentlichungsdatum: 23 Mai 2018

    Projektträger – zwischengeschaltetes Finanzinstitut

    CITY OF WALBRZYCH

    Ort

    Beschreibung

    The proposed project is a framework loan to co-finance investments identified by the promoter and contributing to the Sustainable Development Strategy of the city of Walbrzych in Poland by 2020. Eligible schemes will involve investments in urban renewal, energy efficiency, roads and social housing. Walbrzych's revitalisation efforts are guided by the city's Revitalisation Plan 2016-2025. Additionally, the revitalisation of the social housing stock is supported by a special pilot programme from the Polish Ministry of Development. Walbrzych along with Lodz and Bytom were identified as areas requiring special attention and - due to social and economic problems - additional governmental support.

    Ziele

    This project will revitalise urban areas in Walbrzych, promote sustainable urban development using energy-efficient measures and reduce energy consumption.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    PLN 120 million (EUR 28 million)

    Gesamtkosten (voraussichtlicher Betrag)

    PLN 245 million (EUR 57 million)

    Umweltaspekte

    The schemes implemented under the Framework Loan should have an overall positive impact on the environment, by reducing energy consumption, promoting sustainable urban development, and reducing emissions from car use by improving the road network and favouring public transport. Some of the schemes may, however fall under Annex I or Annex II of the 2011/92/EU Directive, or be located in areas forming part of the Natura 2000 network (falling under Habitats Directive 92/43/EEC or Bird Directive 79/409/EEC). The Bank will assess the promoter's capacity and procedures to ensure compliance with national and European environmental and biodiversity regulations.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2004/18/EC or 2004/17/EC as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Projektstatus

    Unterzeichnet - 5/09/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Stadtentwicklung