    Referenz: 20130229
    Veröffentlichungsdatum: 2 September 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    The borrower is the People's Republic of Bangladesh represented the Ministry of Finance, who will then on-lend to Dhaka Water Supply and Sewerage Authority (DWASA).

    Ort

    Beschreibung

    The project will develop a new sustainable surface water resource that will contribute to meeting the increasing water demand in Dhaka. It will also enable a reduction in the extraction from over-exploited groundwater resources.

    Ziele

    The project will increase the security of water supply and improve the resilience to adverse impacts from climate change.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 493 million

    Umweltaspekte

    It is expected that any significant impacts expected during construction can be mitigated through proper planning, conventional mitigation measures and prudent practices. The project will not affect environmentally sensitive areas. Some involuntary resettlements are expected and a Resettlement Action Plan is under preparation.

    Auftragsvergabe

    The project is to a large extent expected to be implemented under a design-build-operate contract. This will contribute to smooth interfaces between the different project components, and designs that aim to minimise the costs over the whole life of the project. Procurement will be carried out according to ADB guidelines, supplemented with additional conditions to also comply with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 30/06/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.