Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130229
    Date de publication: 2 septembre 2013

    Promoteur – Intermédiaire Financier

    The borrower is the People's Republic of Bangladesh represented the Ministry of Finance, who will then on-lend to Dhaka Water Supply and Sewerage Authority (DWASA).

    Lieu

    Description

    The project will develop a new sustainable surface water resource that will contribute to meeting the increasing water demand in Dhaka. It will also enable a reduction in the extraction from over-exploited groundwater resources.

    Objectifs

    The project will increase the security of water supply and improve the resilience to adverse impacts from climate change.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 493 million

    Aspects environnementaux

    It is expected that any significant impacts expected during construction can be mitigated through proper planning, conventional mitigation measures and prudent practices. The project will not affect environmentally sensitive areas. Some involuntary resettlements are expected and a Resettlement Action Plan is under preparation.

    Passation des marchés

    The project is to a large extent expected to be implemented under a design-build-operate contract. This will contribute to smooth interfaces between the different project components, and designs that aim to minimise the costs over the whole life of the project. Procurement will be carried out according to ADB guidelines, supplemented with additional conditions to also comply with the Bank's Guide to Procurement.

    Statut

    Signé - 30/06/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bangladesh Eau, assainissement