Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130001
    Veröffentlichungsdatum: 6 August 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    UNITED UTILITIES WATER PLC

    Ort

    Beschreibung

    Climate change and environmental investments related to water supply & wastewater treatment infrastructure in the North West of England 2013-15 (AMP5 - Phase II).

    Ziele

    EU Directive compliance in the areas of water and environment is a strong driver behind the investment Programme. It includes a major wastewater treatment works extension in Liverpool required for compliance with the Urban Wastewater Treatment Directive as well as achievement of good ecological and chemical status in the Mersey Estuary under Water Framework Directive.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 925 million (GBP 750 million)

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1850 million (GBP 1500 million)

    Umweltaspekte

    The Promoter complies with the requirements of EU EIA Directive 2011/92/EU, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The drinking water quality and environmental regulators independently monitor compliance with drinking water quality standards and effluent discharge permits

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation Dir 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 19/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Wasser, Abwasser