Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130001
    Date de publication: 6 août 2013

    Promoteur – Intermédiaire Financier

    UNITED UTILITIES WATER PLC

    Lieu

    Description

    Climate change and environmental investments related to water supply & wastewater treatment infrastructure in the North West of England 2013-15 (AMP5 - Phase II).

    Objectifs

    EU Directive compliance in the areas of water and environment is a strong driver behind the investment Programme. It includes a major wastewater treatment works extension in Liverpool required for compliance with the Urban Wastewater Treatment Directive as well as achievement of good ecological and chemical status in the Mersey Estuary under Water Framework Directive.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 925 million (GBP 750 million)

    Coût total (montant approximatif)

    EUR 1850 million (GBP 1500 million)

    Aspects environnementaux

    The Promoter complies with the requirements of EU EIA Directive 2011/92/EU, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The drinking water quality and environmental regulators independently monitor compliance with drinking water quality standards and effluent discharge permits

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation Dir 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 19/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Eau, assainissement