    Reference: 20170166
    Release date: 16 November 2017

    Promoter – Financial Intermediary

    MINISTRY OF INFRASTRUCTURE AND CONSTRUCTION / GDDKIA

    Location

    Description

    The project concerns the construction of an approximately 200 km long 2 x 2 lane expressway, mostly along a new alignment following the route of the existing national road 61 in the north-eastern voivodship of Poland – Podlaskie. Short sections of the new road are located also in two other voivodships – Masovian and Warmian - Masurian.

    Objectives

    The project will improve traffic conditions on a North Sea – Baltic TEN-T corridor. The project addresses the entire S61 road and will facilitate the passage of long distance cross-border as well as regional traffic between Warsaw and the north – eastern part of Poland. The S61 road is providing the main connection in the north-south direction from Warsaw to the Lithuanian border and further to other Baltic countries.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 500 million

    Total cost (Approximate amount)

    EUR 1413 million

    Environmental aspects

    The project involves expressway road construction largely in a rural environment, mostly along a new alignment. The project falls under Annex I of EIA Directive 2011/92/EU, as amended, requiring a full Environmental Impact Assessment (EIA) procedure. The project route crosses the NATURA 2000 sites Ostoja Narwinska (PLH 200024), Dolina Dolnej Narwi (PLB 140014), Puszcza Augustowska (PLB 200002) and Ostoja Augustowska (PLH 200005). Several other NATURA 2000 sites (PLB 140014 Dolina Dolnej Narwi and PLH Ostoja Narwianska) are located in the vicinity of the project. Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investment project is included in the "Programme of National Roads Construction in Poland between 2014- 2023" and the current Operational Program Infrastructure and Environment, both of which were subject to a form of strategic environmental assessment.

    Procurement

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/24/EU, 2004/18/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union (OJEU), as and where required

    Status

    Signed - 20/04/2018

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Poland Transport