Search En menu en ClientConnect
Reference: 20120202
Release date: 25 July 2012

Promoter – Financial Intermediary

General Directorate for National Roads and Motorways.

Location

Description

Construction on a mostly new alignment of dual carriageway 2x2 lane expressway and associated roads in Poland, consisting of three sections along the S7 (total length of 90.5km) and four segments (total length of 300.98 km) of the S8 expressway corridors (TEN-T).

Objectives

Improving traffic flows on part of a Trans-European Network in a convergence region.

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 900 million

Total cost (Approximate amount)

EUR 3314 million

Environmental aspects

A Strategic Environmental Assessment (SEA) has been done for this project, in accordance with the (SEA) Directive 2001/42/EC. Indeed, S7 and S8 corridors are included in the 20112015 National Road Construction Programme. The project falls under Annex I of the EIA Directive 2011/92/EU. In addition, the project also impacts areas covered under the Habitats (92/43/EC) and Birds Directive (2009/147/EC). During appraisal, the Bank shall review the environmental procedures.

Procurement

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation with publication of tender notices in the EU Official Journal, as and where appropriate. During appraisal, the Bank shall review the procedures.

Status

Signed - 11/12/2012

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Poland Transport