Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20020375
    Veröffentlichungsdatum: 13 Juni 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    ESBI International / Coolkeeragh ESB Ltd
    Stephens Court
    Dublin 2

    Electricity Supply Board
    27 Lower Fitzwilliam Street
    Dublin 2
    Ireland
    Contact Point: M. Roche

    Ort

    Beschreibung

    Construction of a 400 MW state-of-the-art combined cycle gas turbine (CCGT) power plant replacing an existing 40-year old oil-fired station on the same site at Coolkeeragh, Northern Ireland. The new plant will be fired by natural gas and will make full use of the existing infrastructure.

    Ziele

    The CCGT technology will mean lower emissions, lower operating costs, and better reliability for Northern Ireland customers. The construction of the plant will enhance regional development.

    Kommentar(e)

    Energy and environment; Regional Development

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to GBP 150 million

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated to be up to GBP 200 million.

    Umweltaspekte

    The project falls under Annex 1 of EU Directive 97/11/EC. An EIA procedure has been followed, including formal public consultation. After the procedures had been completed, the Department of Environment granted full planning permission in July 2001, Government consent to construct and operate was awarded August 2001 and the Industrial Pollution Control authorisation was issued in November 2001. The switch from heavy fuel oil in the existing Coolkeeragh plant to natural gas in the New Coolkeeragh plant and efficient, low-emission combustion equipment will result in relatively low specific emissions to the atmosphere.

    Auftragsvergabe

    The project falls under the EU Procurement Directive 93/38/EC and the main contract for equipment and civil works was published appropriately in the OJEC in December 2000.

    Projektstatus

    Unterzeichnet - 23/07/2003

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Energie