    Referenz: 20160806
    Veröffentlichungsdatum: 17 Februar 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    MANAGUA MUNICIPALITY

    Ort

    Beschreibung

    The project concerns the construction of a 9.6 km bus rapid transit (BRT) line in Managua, with segregated preferential lanes dedicated to high-capacity bus services. The BRT corridor is aligned with the Juan Pablo II avenue, a main inner ring road crossing the city from east to west and connecting the central districts to the suburbs and to the Pan-American interurban road network.

    Ziele

    The proposed project is in line with the EIB's External Lending Mandate 2014-2020 (ELM) as it will contribute to the fulfillment of the following main objectives: (i) climate change mitigation (i.e. fostering use of transport cleaner modes), and (ii) supporting social and economic infrastructure (i.e. improving public transport network and road safety) in Managua. It will also contribute to the implementation of the European Consensus on Development and help to achieve several Sustainable Development Goals (SDG8, SDG11 and SDG13).

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 136 million (EUR 127 million)

    Gesamtkosten (voraussichtlicher Betrag)

    USD 275 million (EUR 257 million)

    Umweltaspekte

    If the project was located within the EU, it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, and would thus require a screening decision from the competent authority. Even though a formal EIA is not required under the applicable legislation in Nicaragua, an environmental impact study has been carried out.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 15/05/2017

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).