Veröffentlichungsdatum: 6 Februar 2017
Projektträger – zwischengeschaltetes Finanzinstitut
ADMINISTRACION NACIONAL DE ELECTRICIDADOrt
Beschreibung
The project is an investment programme which aims to enhance Paraguay's electricity distribution and transmission system in different areas of the country.
Ziele
The programme will improve the safety and reliability of electricity supply to the population of the concerned areas and also adapt the network to the growing demand.
Sektor(en)
- Energie - Energieversorgung
Garantie im Rahmen des Außenmandats
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
USD 94 million (EUR 89 million)
Gesamtkosten (voraussichtlicher Betrag)
USD 195 million (EUR 184 million)
Umweltaspekte
If located in the EU, some programme components would fall under Annex II of the Environmental Impact Assessment (EIA) Directive requiring the competent authority to determine the need for a full environmental impact assessment. The vast majority of the programme components relate to medium or low voltage extensions and reinforcements, works in existing substations, underground high voltage lines and refurbishment, that are expected to have a limited environmental impact. Based on preliminary information and considering the technical characteristics of the programme, none of the programme components are expected to require a full EIA. The main impact that can typically be expected from the proposed activities relate to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance and disturbance during construction. Environmental & social (E&S) aspects will be reviewed during appraisal to ensure alignment with Bank's E&S requirements.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project is done in accordance with the Bank's Guide to Procurement.
Projektstatus
Unterzeichnet - 11/12/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).