Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20140148
    Veröffentlichungsdatum: 1 April 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    London Borough of Barking and Dagenham

    Ort

    Beschreibung

    Development of social and affordable housing to be operated by the London Borough of Barking & Dagenham.

    Ziele

    Under the Framework Loan operation "London Green Fund Co-financing Loan", it is proposed to allocate funding to a large sub-project above the EUR 50m equivalent threshold: The Gascoigne housing estate redevelopment and regeneration is located in the London Borough of Barking and Dagenham, situated in East London. The scheme will concern the demolition and redevelopment of the housing estate area dating from the 1960s, located within the Borough's central area, Barking town centre.

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    GBP 40 million (EUR 49 million)

    Gesamtkosten (voraussichtlicher Betrag)

    GBP 80 million (EUR 98 million)

    Umweltaspekte

    Compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2011/92/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the urban renewal, rehabilitation and reconstruction investments will be reviewed during project appraisal. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed during project appraisal.

    Auftragsvergabe

    The Bank will require the borrower to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Genehmigt - 4/06/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Stadtentwicklung