Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130433
    Veröffentlichungsdatum: 14 Mai 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    The Promoter is the Federal State Niederoesterreich through the publicly owned company “Landeskliniken-Holding”. With 27 hospitals locations, the promoter is the largest hospital provider in Austria.

    Ort

    Beschreibung

    The project supports the infrastructure and organisational development programme for the regional hospital in St Poelten (Landeskrankenhaus (LK) St Poelten) in the Federal State of Lower Austria (Niederösterreich), Austria.

    Ziele

    The hospital is situated in premises which date back to 1894 with the last major extensions in the 1970s. These buildings are no longer suitable for modern healthcare delivery and suffer structural problems and challenges. To ensure an efficient service and modern standards in healthcare delivery, the promoter has developed a long-term investment plan (2011-2021) to further develop the hospital on the existing site.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 575 million

    Umweltaspekte

    Hospitals are not specifically mentioned in the EIA Directive 2011/92/EU, though the project may be covered by Annex II of the Directive in relation to urban development. The Bank’s services will verify during appraisal whether an EIA is required and the screening decision of the competent authority. It is expected that the project will have positive social benefits as healthcare is an element of social cohesion. The public building will be required to at least meet the relevant national targets on energy efficiency. The design energy performance of the hospital and any specific related targets to be met will be verified during appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 20/12/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Österreich Gesundheit