Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130008
    Veröffentlichungsdatum: 31 Juli 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    WESSEX WATER SERVICES LTD

    Ort

    Beschreibung

    The Project comprises a number of water and wastewater investments to be carried out by Wessex Water Ltd in its service area in South-West England during the remainder of the current 5-year Asset Management period (ending in 2015), with a focus on Climate Action components such as asset resilience (Climate Adaptation) and renewable energy (Climate Mitigation).

    Ziele

    The project is driven primarily by the need to upgrade environmental performance and service levels as well as improve reliability of assets.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 245 million (GBP 200 million)

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 490 million (GBP 400 million)

    Umweltaspekte

    The Promoter complies with the requirements of EU EIA Directive 2011/92/EU, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The drinking water quality and environmental regulators independently monitor compliance with drinking water quality standards and effluent discharge permits.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation Dir 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 4/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Wasser, Abwasser