Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20120545
    Veröffentlichungsdatum: 12 Oktober 2017

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    The second phase of the Lower Usuthu Smallholder Irrigation Project aims at equipping 5 750 hectares with irrigation infrastructure including main conveyance, distribution network and on-farm infrastructure, and targets smallholders as final beneficiaries. It will adapt the agricultural production systems to the changing climate while addressing widespread poverty in the region.

    Ziele

    The project aims to increase household income in the new area, enhance food security and improve access to social and health infrastructure for the rural population, by creating the conditions for the livelihood improvement of 2 300 smallholder households, counting more than 10 000 people. The investment will also support the development of the water resources of the Lower Usuthu and the provision of irrigation infrastructure, and enable smallholder farmers to intensify and diversify their agricultural production with fair market access. A minimum of 30% of irrigated arable land will be allocated to food crops, other than sugarcane, targeting local and regional markets. The remaining (max. 70%) will be allocated to sugarcane.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 36 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 123 million

    Umweltaspekte

    A comprehensive Environmental and Social Impact Assessment (ESIA) and the Environmental and Social Management Plan (ESMP), including a Resettlement Action Plan (RAP) based on the country's resettlement policy framework were carried out for this project. In order to address potential cumulative effects with LUSIP I, a Strategic Environmental Assessment (StrEA) assessed the environmental impacts (positive, negative, social or economic) associated with the construction, and operationalisation of the project as a whole (LUSIP I and II). The various documents have been prepared in line with Swaziland's legislation as well as the EIB's and AfDB's standards.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 24/07/2018

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Swasiland Wasser, Abwasser