Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20120235
    Veröffentlichungsdatum: 22 März 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    Fernwärme Wien GmbH

    Ort

    Beschreibung

    Revamping and optimisation of the existing 85.2 MWth waste-to-energy plant Spittelau located in Vienna.

    Ziele

    The project will add environmental and economic values through the improvement of waste-management practices and the diversification and security of fuel and electricity supply in Austria. The technical design suggests that the plant will qualify as a highly efficient combined heat and power (CHP) plant. In virtue of the high amount of renewable energy in the fuel and the targeted energy efficiency in the generation of power and heat, the carbon intensity of the project is expected to be lower than that due to the current operations of the waste-to-energy plant.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 70 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 144 million

    Umweltaspekte

    The project is a modernisation of a waste incineration plant of more than 100 t/day and hence subject to Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU and the Industrial Emissions (IE) Directive 2010/75 EU. The competent authorities have bestowed an integrated pollution prevention and control (IPPC) permit according to local legislation, which is transposed from relevant EU acquis in waste management and waste incineration. The details of the environmental permitting procedure and other relevant “acquis” shall be further verified during the appraisal.

    Auftragsvergabe

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC/ or 2004/18/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Projektstatus

    Unterzeichnet - 19/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Österreich Energie