Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20110555
    Veröffentlichungsdatum: 22 Februar 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    Società di Progetto BreBeMi PPP
    Contact point

    Ort

    Beschreibung

    Construction of the new 62-km toll motorway and ancillary works connecting Brescia to Milano through Bergamo province.

    Ziele

    The new infrastructure should attract part of the long distance traffic currently travelling along the existing A4 motorway and thus is expected to relieve congestion along the corridor Milano-Bergamo-Brescia. It is expected to result in substantial travel time savings as well as a reduction in vehicle operating costs. The Project is expected to have some air quality and greenhouse gas benefits.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 763 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1 600 million

    Umweltaspekte

    The Project will be required to comply with the relevant national and regional legal framework, and to be in line with EU environmental policies. The Promoter has already provided some approval documentation from the Competent Authorities. The compliance with the EIA Directives will be discussed and verified during appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for the implementation of the Project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EEC/ or 2004/17/EEC and Dir. 2007/66/EC), with parallel publication of tender notices in the EU Official Journal, as and where appropriate. During appraisal, the Bank will review the procurement procedures and require that they are compliant with the applicable EU directives.

    Projektstatus

    Unterzeichnet - 25/03/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr