    Referenz: 20110552
    Veröffentlichungsdatum: 24 Februar 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    ELEKTRO ELETRICIDADE E SERVICOS SA

    Ort

    Beschreibung

    The project aims at the renewal and expansion of the promoter's distribution networks, reducing energy losses and enhancing the reliability and quality of electricity supply in the states of Sao Paulo and part of Mato Grosso do Sul. The project will connect some 116 000 customers to the network, of which over 39 000 are low income.

    Ziele

    The project complies with the External mandate as it supports economic infrastructure, social inclusion and poverty alleviation, while supporting EU presence in Latin America through the transfer of know-how.

    Kommentar(e)

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 115 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 238 million

    Umweltaspekte

    If located in the EU, the project would fall under Annex II of Directive 85/337/EEC and its amendments, requiring the component authority to determine whether an EIA is required. Normally ElAs would not be expected given the focus on medium and low voltage networks, whose impacts are related to visual nuisance, vegetation clearance and disturbances during construction. The local environmental assessment rules, biodiversity and social impacts have been assessed during appraisal and the promoter's capacity to address them is good.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in compliance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 8/04/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Brasilien Energie