Veröffentlichungsdatum: 17 August 2009
Projektträger – zwischengeschaltetes Finanzinstitut
Ministry of Finance.Ort
Beschreibung
This project is a proposed loan allocation under the CCCFL and concerns the design, construction and operation of 10 small scale hydro power plants, with a total capacity of 62 MW. The plants are located in the Yichang prefecture (Hubei province).
Ziele
The project supports EU and Bank policy objectives with regard to combating climate change and promoting renewable energy generation, contributing to environmental sustainability.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Up to EUR 44 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 71 million.
Umweltaspekte
If located in the EU, one scheme would fall under the Annex I of the EIA Directive, all other schemes would fall under Annex II. ESIAs have been carried out, including public consultations.
Auftragsvergabe
Procurement will be undertaken in accordance with the Bank’s Procurement Guidelines.
Projektstatus
In Prüfung - 17/08/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).