Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20070334
    Veröffentlichungsdatum: 11 Dezember 2007

    Projektträger – zwischengeschaltetes Finanzinstitut

    Hastings College of Arts & Technolgy

    Ort

    Beschreibung

    The Project concerns the relocation of the current three College campuses to two newly developed sites at Station Plaza and Ore Valley, both in Hastings. The two new facilities will provide more than 27,000 m² of useable space. These new sites and their improved facilities will be much better suited to meet the needs of the College and its growing student base.

     

    Ziele

    The Project is a core part of an ongoing investment programme at Hastings College to expand, improve and rationalise its infrastructure, in order to provide the growing student population with an improved learning environment, a better quality of education, and to expand accommodation facilities.

     

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to GBP 7 million. (under an existing Education Framework Facility with Barclays Bank plc, London)

    Gesamtkosten (voraussichtlicher Betrag)

    Up to GBP 92 million.

    Umweltaspekte

    The Project comprises the construction of new facilities for educational activities. Council Directive 85/337/EEC as amended by Directive 97/11/EC and 2003/35/EC on Environmental Impact Assessment (EIA), does not specifically mention facilities for higher education, but these could in some circumstances be seen as urban development projects, thus falling under Annex II of the Directive. The basis for requesting an EIA by the competent authorities will be verified during project appraisal.  

    Auftragsvergabe

    English Further Education colleges, including Hastings College, are required by the Learning and Skills Council to follow EU procurement guidelines.

    Projektstatus

    In Prüfung - 11/12/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Gesundheit