Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20100674
    Veröffentlichungsdatum: 16 September 2011

    Projektträger – zwischengeschaltetes Finanzinstitut

    Boliden AB (publ)

    Ort

    Beschreibung

    The project concerns an increase of electronic scrap recycling capacity at the Rönnskär copper smelter in Sweden.

    Ziele

    Electronic metal scrap (e-scrap) is one of the quickest growing recycling materials. The project site recycles some 45 000 tonnes per year of e-scrap, and after the expansion this capacity will reach some 120 000 tonnes per year.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 85 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 178 million

    Umweltaspekte

    The project falls under Annex II of the EIA Directive 85/337/EC, amended by Directives 97/11/EC and 2003/35/EC, and the request for an Environmental Impact assessment (EIA), would therefore be at the discretion of local and national authorities. However, it has been indicated to the Bank that a specific EIA is not needed, as it is integrated in the global authorisation permitting procedure which is extensive and currently on-going. The Bank’s services will clarify the possible need for an EIA, as well as any other environmental details during appraisal.

    Auftragsvergabe

    The promoter is a private company not operating in the utilities sector, and is thus not covered by EU Directives on procurement. The company is expected to obtain equipment and services for the project from amongst the few specialised engineering companies, using international negotiations. This procedure, which is usual in this industry, would be in the best interest of the project and in line with the Bank’s procurement policy for private industry projects.

    Projektstatus

    Unterzeichnet - 29/12/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Schweden Industrie