    ACCEPTABLE CORPORATE(S),EDF RENOUVELABLES SA,ENBRIDGE INC

    Lieu

    Description

    Design, build, maintain and operate two offshore windfarms: Saint-Nazaire and Fécamp - 480MW and 498MW, 12km off the French coast in both cases.

    Objectifs

    The development of offshore wind energy will support EU and national targets for renewable energy generation, and contributes to the security of energy supply and environmental objectives. The project will further contribute to the Bank's transversal priority objectives for energy-sector lending related to renewable energy sources and climate action.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 450 million

    Coût total (montant approximatif)

    EUR 1965 million

    Aspects environnementaux

    The project falls under Annex II of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EC, leaving it to the competent authority to decide on the need for an EIA. In line with the French national environmental law (Code de l'Environnement), both wind farms and their grid connection facilities have undergone a full EIA. The environmental permits were issued in the first half of 2016 for both wind farms. The Bank will assess the compliance of the authorization procedure with the relevant EU directives and other environmental aspects of the project during appraisal.

    Passation des marchés

    The Bank will require the promoters to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 29/05/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Énergie