Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount (.*)
    € 15,000,000
    Countries
    Sector(s)
    São Tomé e Principe : € 12,500,000
    Transport : € 15,000,000
    Signature date(s)
    12/07/2024 : € 2,500,000
    19/12/2019 : € 12,500,000
    (*) Including a € 2,500,000 Investment Grants provided by the EU-AFRICA INFRASTRUCTURE TRUST FUND
    Other links

    Summary sheet

    Release date
    10 October 2019
    Status
    Reference
    Signed | 19/12/2019
    20170824
    Project name
    Promoter - financial intermediary
    SAO TOME SUSTAINABLE ROADS
    REPUBLICA DEMOCRATICA DE SAO TOME E PRINCIPE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 15 million
    EUR 28 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the reconstruction, upgrading and coastal protection of the Sao Tome City's main avenue, Avenida Marginal 12 de Julho. The project aims to improve the road safety and connectivity, being the key part of the primary national road network and core element of the capital's urban regeneration and tourism development.

    The project aims to improve safety for pedestrians, motorised as well as non-motorised vehicles on the road and the hinterland, its connectivity as transport and coastal protection corridor and ultimately its climate resilience. The project will also include Technical Assistance for project preparation and implementation. In detail, the project will: i) improve the connection between the capital and the country's main airport; ii) improve the mobility conditions within the capital area; iii) contribute to the improvement of the overall road network by enhancing the link between the national roads EN1, EN2 and EN3; iv) increase the protection of the coastal stretch along the road against erosion and flooding; v) increase the attractiveness of the capital's waterfront for both locals and tourism development; and vi) improve accessibility to the coast and the conditions of fishery landing sites.

    Environmental aspects
    Procurement

    The proposed investments will focus on essential road rehabilitation and coastal protection with direct positive impact in people's livelihoods and the Sao Tome island's environment. The project was subject to a preliminary Environmental and Social Impact Assessment (ESIA), which will be complemented during project preparation with additional studies as needed. An Environmental Permit has been issued for the project. An environmental and social management plan (ESMP) will be part of the project preparation. Details will be assessed during appraisal.

    It is required that the promoter ensures that implementation of the project will be done in accordance with the EIB's Guide to Procurement.

    Comments

    The project is in full support of investments in transport infrastructure (SDG 9), Climate Action (SDG 13) and sustainable and resilient cities (SDG 11), by reducing road users' cost and increasing transport and urban infrastructure resilience, a pre-condition for poverty reduction (SDG 1) and achieving sustainable economic growth (SDG 8). It will also directly contribute to the implementation of Sao Tome's "Nationally Determined Contributions (NDC)", agreed under the COP 21 'Paris Agreement, which prioritises climate adaptation measures.

    Related documents
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Resettlement Action Plan (RAP) - SAO TOME SUSTAINABLE ROADS - Quadro de Politica de Reassentamento
    Publication Date
    16 Oct 2019
    Document language
    Main Topic
    Lending
    Document Number
    123647157
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Resettlement Action Plan (RAP) - SAO TOME SUSTAINABLE ROADS - Resettlement Policy Framework
    Publication Date
    16 Oct 2019
    Document language
    Main Topic
    Lending
    Document Number
    123647163
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Environmental and Social Management Framework
    Publication Date
    16 Oct 2019
    Document language
    Main Topic
    Lending
    Document Number
    123647161
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Quadro de Gestäo Ambiental e Social
    Publication Date
    16 Oct 2019
    Document language
    Main Topic
    Lending
    Document Number
    123647159
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - SAO TOME SUSTAINABLE ROADS
    Publication Date
    2 Dec 2019
    Document language
    Main Topic
    Lending
    Document Number
    123210035
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Part 2 of ESIA report
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160027233
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - SAO TOME SUSTAINABLE ROADS
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160029337
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 5. Typical section Lot 2
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160030336
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 2. Typical Sections Lot 1
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160030936
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Map of landscaping layout
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160030236
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 8 – SEA TURTLES
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160031134
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 3. Trees Affected
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160027107
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Resettlement Action Plan (RAP) - SAO TOME SUSTAINABLE ROADS - Annexes
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160024606
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Part 1 of ESIA report
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160030937
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Map of washhouse location
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160025806
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Map of washhouse elevations section
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160029331
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Washhouse plans
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160031133
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 10. Colonial Houses
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160025807
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Map of coastline
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160029330
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 1 - Layout
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160024603
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Annex 6. Typical Cross Section Lot 3
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160030238
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Resettlement Action Plan (RAP) - SAO TOME SUSTAINABLE ROADS - Abbreviated version
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160025809
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Non Technical Summary
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160029334
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - SAO TOME SUSTAINABLE ROADS - Map of general plant
    Publication Date
    6 Dec 2023
    Document language
    Main Topic
    Lending
    Document Number
    160030934
    Document Focus
    Environmental Information
    Project Number
    20170824
    Sector(s)
    Publicly available
    Download now
    Link to source

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications