Veröffentlichungsdatum: 14 Februar 2025
Projektträger – zwischengeschaltetes Finanzinstitut
IS ADMINISTRATIA DE STAT A DRUMURILOROrt
Beschreibung
Reconstruction of a 29km long section of the M5 TEN-T road between Balti and Riscani. The project involves widening to 2+2 lanes and includes construction of five bridges and three grade-separated interchanges.
Ziele
This is a large allocation under MOLDOVA ROADS IV Framework Loan (2020-0537) signed on 31.03.2022 for EUR 150m. The project concerns the reconstruction of a 29km section of the M5 TEN-T Extended Core Network Road between Balti and Riscani. The project will improve accessibility, level of service and traffic safety on the corridor. Besides, the Project will improve the resilience of the transport corridor to climate change impacts.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Under Global Europe NDICI guarantee
Under EFSD+ Guarantee
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 120 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 129 million
Umweltaspekte
The project involves upgrade of an existing road, predominantly within the existing right of way. The screening out decision was issued by the Environmental Agency (Environmental Agreement No. 10/1190/2023). The Authority does not expect project to have significant negative impact on the environment.
Auftragsvergabe
The procurement of work and services contracts financed by the Bank will be in line with the relevant sections of the EIB Guide to Procurement.
Projektstatus
In Prüfung
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).