Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20160225
Veröffentlichungsdatum: 11 Juli 2016

Projektträger – zwischengeschaltetes Finanzinstitut

ACCEPTABLE CORPORATE(S)

Ort

Beschreibung

The project will consist of a new academic and education building including a library, theatre and additional sports facilities; the extension of some existing academic buildings and the refurbishment of several existing college facilities.

Ziele

The project concerns the construction of a new academic and education building, the extension of the Education Research Centre and the refurbishment of several existing college facilities. This will provide additional research facilities, academic facilities, lecture theatres and sports facilities. The RCSI campus is located in the city centre of Dublin.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 50 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 103 million

Umweltaspekte

The project comprises the construction of a new academic and education building, the extension of other academic buildings and the refurbishment of several existing college facilities. Directive 2011/92/EU, as amended by Directive 2014/52/EU, does not specifically mention the need for an environmental impact assessment (EIA) for buildings related to education, but it may be that some sub-projects can be regarded as urban renewal projects and might require an EIA (Annex II of the directive). This will be examined during the appraisal.

Auftragsvergabe

The procedures for tendering and procurement used by the promoter must comply with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC. The procedures will be assessed during the appraisal.

Projektstatus

Unterzeichnet - 15/12/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Irland Bildung