Veröffentlichungsdatum: 29 August 2014
Projektträger – zwischengeschaltetes Finanzinstitut
KYRGYZ REPUBLICREPUBLIC OF TAJIKISTAN
Ort
Beschreibung
Construction of power-transmission infrastructure in Kyrgyzstan and Tajikistan. The proposed schemes form part of a larger regional project led by the World Bank and involving four Asian countries (Kyrgyzstan, Tajikistan, Afghanistan and Pakistan).
Ziele
The objective of the “Central Asia-South Asia Electricity Transmission and Trade Project” (“CASA-1000”) is to create the conditions for sustainable trade of renewable electricity (hydro) between the Central Asian countries of Tajikistan and Kyrgyzstan and the South Asian countries of Afghanistan and Pakistan, thus alleviating power supply shortages in the aforementioned South Asian countries and enhancing revenues in Tajikistan and Kyrgyzstan.
Kommentar(e)
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 140 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 282 million
Umweltaspekte
High voltage transmission lines require an EIA to be carried out.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank’s Guide to Procurement.
Projektstatus
Unterzeichnet - 23/12/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).