Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20120134
Veröffentlichungsdatum: 26 Februar 2014

Projektträger – zwischengeschaltetes Finanzinstitut

PENNON GROUP PLC

Ort

Beschreibung

South West Water (SWW) provides water and wastewater services to a population of 1.6 million people in the South-West of England, in the counties of Cornwall and Devon, as well as smaller areas within Dorset and Somerset. The investment programme was approved by the economic regulator OFWAT in 2009 as part of the expenditure programme for the regulatory period 2010-15 (Asset Management Plan 5). The investments are driven by EU Directive compliance in the areas of wastewater, bathing waters and protection of aquatic life. In addition there is significant focus on reduction of flooding due to insufficient wastewater system capacity and creating efficiencies and energy recovery in operations, with benefits in terms of climate change resilience and mitigation.

Ziele

Primary Objectives
- Environmental Protection
- Renewable Energy and Energy Efficiency
Transversal Indicators
- Climate Action
- Economic and Social Cohesion

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 156 million (GBP 130 million)

Gesamtkosten (voraussichtlicher Betrag)

EUR 359 million (GBP 300 million)

Umweltaspekte

The Promoter complies with the requirements of EU EIA Directive 2011/92/EU, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The drinking water quality and environmental regulators independently monitor compliance with drinking water quality standards and effluent discharge permits.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation Dir 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 18/05/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Wasser, Abwasser