Referenz: 20100681
Veröffentlichungsdatum: 31 August 2011

Projektträger – zwischengeschaltetes Finanzinstitut

Agence pour la Sécurité de la Navigation Aérienne en Afrique et à Madagascar (ASECNA)

Contact : A.O. Guitteye
32-38 avenue Jean Jaurès
BP 3144 Dakar-Plateau, Sénégal

Ort

Beschreibung

The project is part of ASECNA's investment plan for the period extending to 2013 (Plan de Services et d'Equipements (PSE) 2009-2013). The project focuses on upgrading and extension of ASECNA’s Air Traffic Control facilities.

Ziele

The project is designed to enhance the safety, efficiency and reliability of the Air Traffic Control (ATC) facilities in the ASECNA air space.

Kommentar(e)

More generally, ASECNA’s strategic plan aims at:
- improving flight safety and reliability in its airspace
- improving governance and economic efficiency

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

Up to EUR 40 million

Gesamtkosten (voraussichtlicher Betrag)

Around EUR 86 million

Umweltaspekte

The project is ostensibly an upgrade to the promoter‘s already existing Air Traffic Control systems. Some infrastructure and or construction may have to be developed but on existing facilities. Thus an EIA in compliance with the requirements of the EU EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC is not required. Compliance with relevant environmental legislation will be verified during appraisal.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement directives, with publication of tender notices in the EU Official Journal, as and where appropriate and will examine the procurement procedures during appraisal.

Projektstatus

Unterzeichnet - 29/11/2012

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Regionalvorhaben - Afrika Verkehr