Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20100281
Veröffentlichungsdatum: 22 Oktober 2014

Projektträger – zwischengeschaltetes Finanzinstitut

REPUBLIC OF LEBANON - COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION

Ort

Beschreibung

Expansion of the existing wastewater preliminary treatment plant, located in Southern Beirut, and its conversion into a primary treatment plant and construction and upgrade of sewer networks in the catchment area.

Ziele

The project will improve the poor quality of the coastal water and, through the provision of improved sanitation services, the quality of life for an estimated one million inhabitants (a quarter of the Lebanese population) and will reduce pollution and environmental stress in the Al Ghadir drainage area and the Mediterranean Sea.

Kommentar(e)

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Garantie im Rahmen des Außenmandats

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 68 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 146 million

Umweltaspekte

The project will generally benefit the environment and public health by providing sanitation to a population of around one million inhabitants (a quarter of the Lebanese population), and by collecting and treating waste water before discharging it into the Mediterranean Sea. It will therefore reduce pollution of beaches and coastal waters within the Al Ghadir drainage area south of Beirut as well as of the Mediterranean Sea. An environmental and social impact assessment has been approved by the competent authority, the Ministry of Environment. The Bank will review during appraisal its compliance with the Bank's environmental and social safeguards and applicable national and international standards.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 28/02/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Libanon Wasser, Abwasser