Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090053
    Veröffentlichungsdatum: 12 Juni 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    GKN Aerospace, Ltd.

    Ort

    Beschreibung

    The project concerns the promoter’s RDI activities related to the design, development and industrialisation of new composite wing structural parts, e.g. rear inner wing spar and the fixed trailing edges, to be assembled in a new generation aircraft.

    Ziele

    The project will contribute to increasing the promoter’s knowledge and know-how in the design, development and innovative manufacturing of lighter aircraft structures (composite wings), bringing about positive environmental results in terms of improved transportation efficiency and lower fuel consumption, CO2 and other harmful emissions. Such technology is in line with EU policy on reducing pollutant emissions and will contribute to improving the competitiveness of the European aerospace industry.

    The project is in line with EC policy orientations to promote private and competitive innovation, being eligible for EIB financing under article 267 (c) of the EC Treaty as “Knowledge Economy (i2i)” as both “Research and Development” and “Innovation”.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    GBP 80 million.

    Gesamtkosten (voraussichtlicher Betrag)

    Approximately GBP 160 million.

    Umweltaspekte

    A part of the project concerns investments in R&D and innovation that will be carried out in existing facilities, already authorised and for which an EIA is not required by EIA Directive 86/557/EC, amended by Directives 97/11/EC and 2003/35/EC. Another part of the project mainly concerns the investments in tooling and machinery. The Bank’s services will verify details during the project’s due diligence and whether an EIA is required by EIA Directive 83/557/EC, amended by Directives 97/11/EC and 2003/35/EC.

    Auftragsvergabe

    Procurement is expected to be in line with EIB guidelines for private sector projects. The Bank’s services will verify details during the project’s due diligence.

    Projektstatus

    Unterzeichnet - 23/12/2009

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Industrie