Suche starten De menü Kundenportal der EIB-Gruppe
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20080446
Veröffentlichungsdatum: 4 August 2009

Projektträger – zwischengeschaltetes Finanzinstitut

Ministry of Transport and Communications
4, Crvena Skopska Opstina
1000 Skopje
Tel. +389 2 3145 519

Ort

Beschreibung

The project concerns the promoter’s capital investment programme for the years 2009 to 2013 which is driven by the need to increase water supply in rural areas and to improve waste water disposal throughout the country, in compliance with the relevant EU Directives. The programme loan concerns investments in most of the 84 municipalities of the country.

Ziele

The investments are aimed on the one hand at preparing for compliance with the EU ‘acquis communautaire’ in the broader water sector, and on the other hand at improving living standards and providing a framework for economic development in medium and small-sized towns and villages.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 50 million.

Gesamtkosten (voraussichtlicher Betrag)

EUR 100 million.

Umweltaspekte

The project will generally benefit the environment and public health, either by providing better drinking water to the population, improving the efficiency of the treatment and distribution facilities, or by collecting and cleaning wastewater before discharging into receiving waters. As an EU candidate member state, the project will contribute to FYROM’s future compliance with EU standards and regulations on water, sanitation and the environment.Compliance with national EIA legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations concerning the protection of habitats, respective EU Directives are considered to be transposed, subject to verification during appraisal. FYROM is part of the international EMERALD network, and procedures for compliance herewith will also be verified. A social assessment will also be undertaken as part of the appraisal.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the Project shall be tendered in accordance with the relevant EU procurement legislation (2004/17/EC) with parallel publication of tender notices in the EU Official Journal where applicable.

Projektstatus

Unterzeichnet - 14/07/2010

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Nordmazedonien Wasser, Abwasser