Veröffentlichungsdatum: 8 Juni 2007
Projektträger – zwischengeschaltetes Finanzinstitut
Ukrenergo NEK GP25, Kominternu Street,
01032, Kyiv, Ukraine
Ort
Beschreibung
Construction of a 350 km long 750 kV AC transmission line from Rivne in north-western Ukraine to Kiev in central Ukraine and a 135 km-long diversion of the existing Khmelnitska to Chernobyl power line into the Kiev substation, extension of Kiev substation and two 60 km, 330kV lines connecting Kiev substation to 330 kV network. The project would constitute a major electricity backbone link from the Kiev area to western Ukraine, ultimately connecting to the Trans-European Energy Networks (TEN-Es).
Ziele
The aims of the project are: to reinforce the transmission network, to use the generation capacity more economically, to enable Ukraine to improve its participation in the European energy markets, to reduce losses and facilitate lower carbon emissions and to enhance the security of supply to the Kiev city area.
Kommentar(e)
Electricity
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 150 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 300 million
Umweltaspekte
Due to its size and technical characteristics, the project, if located within the EU, would fall under Annex I of Directive 97/11/EC and would thus require an Environmental Impact Assessment (EIA). An EIA in line with EU requirements, including public consultation, was completed in 2007 for the 350 km long 750 kV transmission line from Rivne to Kiev and the 135 km long diversion of the existing Khmelnitska to Chernobyl power line into the Kiev substation. The promoter is preparing an EIA in line with EU requirements, including public consultation, for the other components of the project and is expected to be completed before start of the works for these components.
Auftragsvergabe
The Bank will require the promoter to ensure that all supply contracts financed by the Bank will be established in compliance with the Bank's Guide to Procurement.
Projektstatus
Unterzeichnet - 24/10/2008
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).