    Referenz: 20050525
    Veröffentlichungsdatum: 9 Mai 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    TENNET TSO BV
    Arnhem
    The Netherlands

    Ort

    Beschreibung

    580 km submarine power cable link across the North Sea in order to interconnect the Dutch and Norwegian national power systems.

    Ziele

    Interconnection of the Dutch and Norwegian national power systems. The project will deepen the internal market in electricity, increase market liquidity and decrease price volatility by enabling the transmission and trade of electricity between The Netherlands and Norway by taking advantage of differences in the generation structures in both countries (predominantly thermal in The Netherlands; hydro in Norway). It will also offer increased security of supply to the relatively tight power systems in the countries concerned.

    Kommentar(e)

    Electricity transmission

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 280 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 572 million

    Umweltaspekte

    The environmental impacts of the project have been analysed in detail in all countries concerned. The project does not fall under the EU EIA Directive (85/337/EEC) since it concerns a submarine/underground cable with indoor converter stations. Nevertheless, a full EIA has been carried out in The Netherlands. The authorities in The Netherlands concluded that the project will have no impacts of any significance on any Natura 2000 area. In Norway, all regulatory requirements were fulfilled, and the licensing was done in accordance with all relevant legislation based on international conventions. As regards Danmark and Germany, all relevant impacts were described and relevant reports added in the permit applications, resulting in licenses being granted by the respective authorities.

    Auftragsvergabe

    The promoter followed public tendering in compliance with the relevant EU Directive.

    Projektstatus

    Unterzeichnet - 22/11/2007

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Niederlande Energie