Veröffentlichungsdatum: 4 August 2004
Projektträger – zwischengeschaltetes Finanzinstitut
Régie Autonome Intercommunale de Distribution d’Eau et d’Electricité de Fès (R.A.D.E.E.F.)Ort
Beschreibung
The project consists of the construction of a wastewater treatment plant with a capacity of 1.5 million equivalent inhabitants for the city of Fès, along with interceptors and pumping stations connecting the plant to sewerage networks under construction with World Bank financial support.
Ziele
The project represents an opportunity to resolve substantially the serious problem of (mainly industrial) pollution, which has a highly adverse environmental impact and prevents the adequate management of aquiferous resources in the Sebou basin.
The project has mainly environmental objectives.
Kommentar(e)
Sanitation in the city of Fès.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Loan of up to EUR 40m from the Bank’s own resources under the EUROMED II Mandate with maximum interest subsidy of 3% from the MEDA II budget.
Gesamtkosten (voraussichtlicher Betrag)
Around EUR 80m.
Umweltaspekte
An environmental impact assessment (EIA) has been carried out for the project. Its conclusions and proposed mitigating measures are under discussion and will be closely examined during the appraisal.
Auftragsvergabe
The different components of the project will put out to public tender in accordance with the EIB’s Guide to Procurement, with publication in the OJEU where required.
Projektstatus
Unterzeichnet - 15/12/2004
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).