Übersicht
This is the second allocation under "Framework Loan Lao Resilient Roads" to finance works aiming at improving Lao National Road 2 East (NR2E), from the Oudomxay Provincial centre to the Vietnam border, an important east-west corridor in South Asia linking Thailand-Laos-Vietnam (Asian Highway No. 13). With a total length of 295 km, NR2 consists of a West section (NR2W) (145 km) connecting with the Thai border at Huai Kone-Nam Ngeun and an East section (NR2E) (150 km) connecting with the Vietnamese border at Panghok-Tay Trang, Dien Bien Phu Province. In light of this, the Lao National Road 2 helps to achieve Lao PDR's aspiration to become a land-linked country through the development of economic corridors.
The aim is to improve the climate resilience and strengthen the maintenance systems of NR2 by ensuring that road rehabilitation is done according to the latest climate resilience guidelines. The project is expected to bring a range of positive benefits to the local communities such as improved travel quality and reliability, increased access to social, educational and health care services, local market development of agricultural and business activities as well as more employment opportunities.
An Environmental and Social Management Framework has already been prepared for the project. In line with the requirements, having confirmed that the project does not require an environmental impact assessment (EIA), the Promoter has screened out the EIA and prepared two Initial Environmental Examination (IEE), which were both submitted to the Provincial Office of Natural Resources and Environment (PONRE) of Phongsaly and Oudomxay in 2023. The two IEEs were approved by the PONRE and the required Environmental Compliance Certificates (ECCs) were issued in February 2023. µ The IEE will be assessed during appraisal along with any impact on protected areas. The Promoter will be required to verify that all investments are carried out in line with the EIB Environmental & Social (E&S) standards. The road also forms part of a section of the Asian Highway No. 13 (AH13), which is one of the east-west corridors in Southeast Asia. The NR2E connects with the Vietnamese border at Panghok-Tay Trang, Dien Bien Phu Province and NR2W connects with Thailand border at Ban Pheng Ngam and Muang Ngeun. Thus, this project aims to improve the climate resilience of the NR2E and NR2W and will contribute to Climate Adaptation objectives of Lao government, the EIB and the EU.
The project will be procured under an Output and Performance Based Road Contracts (OPBRC), with a 10-year contract life. The procurement plan for this project will include eight contracts, namely: two consultancy contracts for works supervision of approximately €3 million each (for NR2E and NR2W sections) and six works contracts (3 packages for NR2E and 3 Packages NR2W). EIB financing includes three contracts covering for two works contract packages for NR2E and supervision contract. The works supervision contract will be procured through an international competitive bidding procedure with pre-qualification (restricted tender procedure). The works contract will be procured through an international competitive bidding procedure (open procedure) with two envelopes. The Promoter has to ensure that implementation of the contracts financed by the EIB are done in accordance with the EIB's Guide to Procurement.
This operation is covered by the ELM Guarantee.
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).
Dokumente
Allgemeine Fragen und Anmerkungen
Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.
Medienanfragen
Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.
Beschwerdemechanismus
Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.
„Null Toleranz“ gegenüber Betrug und Korruption
Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.
Weitere Veröffentlichungen