    € 46,500,000
    Countries
    Sector(s)
    Tunisia : € 46,500,000
    Energy : € 46,500,000
    Signature date(s)
    29/11/2016 : € 46,500,000
    Other links

    Summary sheet

    Release date
    17 June 2015
    Status
    Reference
    Signed | 29/11/2016
    20140184
    Project name
    Promoter - financial intermediary
    STEG V TRANSPORT ELECTRICITE
    SOCIETE TUNISIENNE DE L'ELECTRICITE ET DU GAZ
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 46 million
    EUR 110 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The project is a multi-component investment programme encompassing 17 electricity transmission schemes geographically dispersed throughout Tunisia. Overall the project comprises the construction of 6 new substations, the extension of 11 existing substations, the erection of 43 km of overhead lines and the installation of 53 km of underground cables.

    The main purpose of the project is to integrate new conventional power generation facilities into the grid, to reinforce the interface to the distribution grid and ultimately to contribute to catering for the electricity demand of the country that over the coming years is projected to grow at a pace of 4-5%/year. The project will essentially help to improve the availability of power supply, which is crucial for the economic development of the country.

    Environmental aspects
    Procurement

    Five schemes under the scope of the project, if implemented in the EU, would fall under Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive. The Bank will require the promoter to carry out environmental and social impact assessments for such schemes and to implement the resulting mitigating and/or compensation measures.

    The project is in the public sector and is therefore subject to public procurement. The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank’s Guide to Procurement and the relevant applicable EU public procurement rules.

    Under ELM Guarantee

    This operation is covered by the ELM Guarantee.

    Related documents

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Etude d'impact sur l'environnement et social des projects de transport d'electricité - LOT 2: Region du Cap Bon
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    64335446
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Etude d'impact sur l'environnement et social des projets de transport d'electricité - LOT 1: Region de Tunia
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    64339172
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Etude d'impact sur l'environnement et social des projets de transport d'electricité - LOT 3: Region Nord
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    64339919
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Plan d'Action Environnemental & Social (PAES)
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    65990867
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - STEG V TRANSPORT ELECTRICITE - Etude des impacts socio-economiques - Cadre d'acquisition foncière et compensation
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    65990868
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - STEG V TRANSPORT ELECTRICITE
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    65993006
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - STEG V TRANSPORT ELECTRICITE
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    65993601
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - STEG V TRANSPORT ELECTRICITE
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    65998787
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Plan d'Action Environnemental & Social (PAES)
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66000051
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Etude des impacts socio-economiques - Cadre d'acquisition foncière et de compensation
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66000961
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Plan de participation des parties prenantes (version Française)
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66001705
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Evaluation avifaune et plan de protection aviaire
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66002402
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Plan de participation des parties prenantes (version Arabe)
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66002403
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Evaluation avifaune et plan de protection aviaire
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66002594
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - STEG V TRANSPORT ELECTRICITE - Environmental and Social Action Plan
    Publication Date
    23 Apr 2016
    Document language
    Main Topic
    Lending
    Document Number
    66003196
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - STEG V TRANSPORT ELECTRICITE
    Publication Date
    5 Jul 2016
    Document language
    Main Topic
    Lending
    Document Number
    67479548
    Document Focus
    Environmental Information
    Project Number
    20140184
    Sector(s)
    Countries
    Publicly available
    Download now
    Link to source

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications