Release date
14 September 2023
Status
Reference
Approved | 09/10/2023
20230045
Project name
Promoter - financial intermediary
CEDILLO ALLOCATION GREEN ENERGY FL 20220085
IBERDROLA SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 373 million
EUR 773 million
Location
Sector(s)
  • Energy - Electricity, gas, steam and air conditioning supply
Description
Objectives

Financing of the Cedillo (375 MW), Velilla (350 MW), Ciudad Rodrigo (304 MW) and Peñaflor (137 MW) solar photovoltaic (PV) projects and of the Iglesias on-shore wind farm (70 MW) in Spain. Second allocation under the framework loan (FL) IBERDROLA GREEN ENERGY FRAMEWORK LOAN II.

This project consists of the construction and development of new renewable energy plants that will contribute to the EU-wide target of 32% of energy from renewable sources in gross final energy consumption (RES) for 2030 as set out in the current EU RE Directive (Directive (EU) 2018/2001), and the national targets as defined in the Spanish energy and climate plan (NECP). The project will also contribute to achieving REPowerEU objectives of increasing the RES 2030 target from 32% to 42.5%. Based on the information received, ca. 89% of the plants in this allocation are located in EU Cohesion Priority Regions. The financing of this project is in line with the Bank's priority energy lending related to renewable energy and climate action.

Additionality and Impact

The allocation increases the production of electricity from low carbon sources (solar PV and onshore wind) and addresses the market failure of negative climate and environmental externalities through the reduction of carbon emissions and other air pollution. The allocation will contribute to the European RE target of 42.5% in gross final energy consumption for 2030, which is expected to be adopted in the revised Renewable Energy Directive (2018/2001/EU) as part of the REPowerEU Plan. The allocation will also contribute to the Spanish NECP -currently under revision for more ambitious solar PV and onshore wind targets.

The financing of this allocation also contributes to Bank's lending priority objectives on Energy (Renewable Energy) as well as on climate action (transversal), and on economic and social cohesion (transversal). The project produces electricity from low carbon sources (solar PV and onshore wind), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation). As the schemes are expected to rely (at least partially) on revenues from the market (the wholesale market and/or unsubsidized commercial Power Purchase Agreements), in a sector characterised by incomplete markets (limited forward/hedging, lack of scarcity and locational pricing), the project improves market efficiency and competition. The schemes are mostly located in EIB Cohesion Priority regions.

The project Quality and Results is rated Very Good. The project has an excellent economic return and the current electricity market prices are not fully reflecting the value of electricity. Besides, the promoter has a recognised in-house design and project management capacity with a significant track record of international energy projects.

EIB's contribution is considered Very Good. The EIB's offering is more favourable than market alternatives under various dimensions. The promoter deems financing with an "EIB Green Loan" label as a stamp of quality on its investments and environment-related procedures. The Bank will monitor the operation on an annual basis (annual Project Progress Report).

Environmental aspects
Procurement

The overhead transmission line for "Iglesias" wind farm is included in the Annex I of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU, with ca. 20km in 220 kV. All the PV plants and other grid interconnection infrastructure are included in the Annex II of the EIA Directive and have been screened in by the competent authority. All plants and associated infrastructure underwent an environmental impact assessment (EIA) process, including public consultation. The plants and associated infrastructure obtained their environmental permits (Declaración de Impacto Ambiental - DIA) between September 2022 and January 2023. The authorisation procedure and compliance with the relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be assessed at appraisal, in particular the potential cumulative impacts assessment and the impacts on protected flora and fauna, including Natura 2000 sites. Given that China largely dominates the market of photovoltaic solar panels, and media reports that supply chain of these products would involve forced labour, the Bank will apply an enhanced due diligence on the topic, in line with the EIB's Environmental & Social Standards.

The promoter has been assessed as a private company and the schemes envisaged for this operation are market-based renewable energy projects, which do not enjoy any special or exclusive rights. Therefore, private sector procurement procedures should apply. However, if at appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require these rules to be applied.

Milestone
Approved
9 October 2023
Related documents
Related projects
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085
Publication Date
17 Oct 2023
Document language
Main Topic
Lending
Document Number
177081754
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PE Iglesias - PLANO 9 PENDIENTES
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155566485
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PE Iglesias - Plano 7.2. Sinergias PE Escenario 2
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155566293
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PE Igelsias - PLANO 5 - INDICES COMBINADOS (IC) EN CYL, ÁREAS DE ALTO VALOR NATURAL (HNV)
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155566996
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PE Iglesias - PLANO 14 RUIDOS ISOFONAS
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155561698
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PE Iglesias - Estudio de impacto ambiental
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155567299
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PE Iglesias - Proyecto de Autorización de Trabajos Arqueológicos Estudio de Valoración Histórico-Cultural
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155562723
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - ESTUDIO DE IMPACTO AMBIENTAL DEL PARQUE EÓLICO “EL PUNTAL II”
Publication Date
8 Jun 2023
Document language
Main Topic
Lending
Document Number
170796996
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - EL Puntal II - INFORME DEL CICLO DE AVIFAUNA DEL PARQUE EÓLICO
Publication Date
8 Jun 2023
Document language
Main Topic
Lending
Document Number
170762107
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - Plano de Situación con ortofotografía
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155554578
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - METODOLOGÍA DE TRABAJOS DE CAMPO
Publication Date
17 Nov 2023
Document language
Main Topic
Lending
Document Number
155553053
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Estudio iluminación Planta Solar Fotovoltaica de 374,9 MW.
Publication Date
17 Nov 2023
Document language
Main Topic
Lending
Document Number
155555580
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Informe de Actuaciones Arqueológicas
Publication Date
17 Nov 2023
Document language
Main Topic
Lending
Document Number
155561592
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Estudio socioeconómico frente al Reto Demográfico
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552868
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Resumen no técnico
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552659
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Plano - Situación y Emplazamiento
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155557211
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO DE IMPACTO PAISAJÍSTICO
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155557947
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO DE LA VULNERABILIDAD DEL PROYECTO
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155564193
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO ACÚSTICO
Publication Date
16 Nov 2023
Document language
Main Topic
Lending
Document Number
155560524
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - ADENDA AL ESTUDIO DE IMPACTO AMBIENTAL
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552655
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - ESTUDIO DE FAUNA-CICLO ANUAL
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552329
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO HIDROLÓGICO (INUNDABILIDAD) COMPLEMENTARIO
Publication Date
16 Nov 2023
Document language
Main Topic
Lending
Document Number
155560413
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - ESTUDIO DE IMPACTO
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
182981262
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - ESTUDIO DE EFECTOS ACUMULATIVOS Y SINERGICOS
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552755
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ESTUDIO DE IMPACTO AMBIENTAL
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155555279
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO DE IMPACTO AMBIENTAL
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155556777
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - PROSPECCIÓN ARQUEOLÓGICA Y ESTUDIO DE PATRIMONIO CULTURAL
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155561589
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Plano - Zona de riesgo de incendio en plana
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552963
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO DE CAMPOS ELECTROMAGNÉTICOS
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155553988
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Ciudad Rodrigo - RESUMEN NO TÉCNICO
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
182982023
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Velilla - ANEXO XII – DOCUMENTO DE SÍNTESIS
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155552569
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ESTUDIO DE REPERCUSIONES SOBRE RED NATURA 2000
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
169211103
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Revilla Vallejera - ESTUDIO DE EFECTOS SINÉRGICOS
Publication Date
8 Jun 2023
Document language
Main Topic
Lending
Document Number
170793802
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO DE IMPACTOS ACUMULATIVOS, SINÉRGICOS Y EFECTOS TRANSFRONTERIZOS
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155554357
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Revilla Vallejera - ADENDA AL ESIA: ESTUDIO DE FAUNA
Publication Date
8 Jun 2023
Document language
Main Topic
Lending
Document Number
170784896
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - MEMORIA DESCRIPTIVA
Publication Date
14 Dec 2023
Document language
Main Topic
Lending
Document Number
169219762
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ESTUDIO DE SINERGIAS Y EFECTOS ACUMULATIVOS
Publication Date
13 Dec 2023
Document language
Main Topic
Lending
Document Number
169216938
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ESTUDIO FAUNISTICO
Publication Date
13 Dec 2023
Document language
Main Topic
Lending
Document Number
169211006
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ESTUDIO DE ALTERNATIVAS
Publication Date
13 Dec 2023
Document language
Main Topic
Lending
Document Number
169214872
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ESTUDIO DE VULNERABILIDAD
Publication Date
13 Dec 2023
Document language
Main Topic
Lending
Document Number
169216292
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - PLAN DE RESTAURACIÓN ECOLÓGICA
Publication Date
13 Dec 2023
Document language
Main Topic
Lending
Document Number
169215946
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Peñaflor - ANTEPROYECTO DE RESTAURACIÓN E INTEGRACIÓN PAISAJISTICA
Publication Date
13 Dec 2023
Document language
Main Topic
Lending
Document Number
169214878
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - ESTUDIO DE AFECCIÓN A RED NATURA 2000
Publication Date
18 Nov 2023
Document language
Main Topic
Lending
Document Number
155560128
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Velilla - ESTUDIO DE IMPACTO AMBIENTAL
Publication Date
16 Nov 2023
Document language
Main Topic
Lending
Document Number
155566091
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Cedillo - Plano 2
Publication Date
16 Nov 2023
Document language
Main Topic
Lending
Document Number
155553052
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - CEDILLO ALLOCATION GREEN ENERGY FL 20220085 - PFV Villarino - ESTUDIO DE EFECTOS ACUMULATIVOS Y SINÉRGICOS
Publication Date
8 Jun 2023
Document language
Main Topic
Lending
Document Number
171360966
Document Focus
Environmental Information
Project Number
20230045
Sector(s)
Regions
Countries
Publicly available
Download now
Link to source

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications