These more comfortable and reliable trains will help convince people living on the outskirts of Munich to leave their cars at home and take the train.
Signature(s)
Summary sheet
Acquisition of about 110 new high capacity electric multiple units (EMUs) for S-Bahn Muenchen to replace life-expired vehicles, in support of an ongoing public transport capacity extension programme.
The project consists of the financing of the acquisition of new rolling stock (electric multiple units, or EMUs) estimated at about 110 vehicles and associated equipment for a public service contract to operate the rail passenger services on the S-Bahn network of Munich, Bavaria. The new fleet will complement the service improvements enabled by significant infrastructure works, in particular the enhancement of the tunnel through the city centre and the refurbishment of five sizeable stations. Together, these will allow increasing the service frequency and train length.
The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU (as amended by Directive 2014/52/EU) as manufacturing and use of rail rolling stock is not included in either list. The need for an environmental impact assessment (EIA) and/or assessment according to the Habitats Directive 92/43/EEC for associated facilities (e.g. maintenance workshops or depots), not included in the investment proposed but needed for the correct operation of the new rolling stock, will be analysed during the appraisal. Arrangements for the replacement or decommissioning of old rolling stock will be reviewed during appraisal. All else equal, the project is expected to have a positive environmental impact by contributing to modal shift from road to railways.
The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Documents
News & Stories
Inside the project
How and Why
Ease congestion, cut emissions
Why
- Munich’s regional rail network is prone to delays because of congested infrastructure
- The energy-efficient electric trains will cut CO2 emissions and convince more commuters to take the train instead of their cars
How
- The new trains have extra-wide doors to make getting on and off easier and faster
- New 200-metre-long trains will improve reliability and passenger comfort
Sectors & Countries
Play video
2:53
Related media
Rail renaissance in North Macedonia
On the right side of the tracks
On track to a greener future
Related projects and stories
How Bulgaria became a venture capital hub
EIF backed venture capital has transformed Bulgaria into a regional startup hub, supporting deep tech innovation and high-value jobs.
How innovative construction could help solve the industry's labour shortage
Digitalisation and robotics will transform how we build – and make construction more attractive to young people, solving the industry’s labour shortage
Complaint Mechanism Policy renewal
The EIB Group is upgrading its independent Complaint Mechanism policy, following an external review and alignment with best practices of peer institutions. The proposed policy, submitted for a public consultation, foresees a more efficient handling of complaints, enhanced use of the Dispute Resolution mechanism to solve conflicts between project promoters and affected people, and other improvements. The draft policy focuses on alleged environmental and social impacts of the projects we finance and access to information about them, as part of our commitment to transparency, integrity and accountability.