Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20180271
    Release date: 16 March 2021

    Promoter – Financial Intermediary

    JAVNO PREDUZECE AUTOCESTE FBIH DOO

    Location

    Description

    The project consists of the construction on a new alignment of the 10 km Tunnel Prenj and 24 km of road approaches as part of the Konjic - Mostar North road section on motorway Corridor Vc in central Bosnia and Herzegovina (BiH). The motorway road section is part of the Pan-European Corridor Vc linking Hungary and northeastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of the port of Ploce. The project lies on the indicative extended Trans-European Transport Network (TEN-T) Mediterranean core network. The road section of the project is included in the Single Project Pipeline agreed between the Government of BiH and European Commission as adopted by the BiH National Investment Committee in February 2019. The project road section is also aligned with BiH's Transport Strategy 2016-2030.

    Objectives

    The Corridor Vc motorway connection is essential for fostering economic growth in the country. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region. The project will facilitate convergence toward EU standards in terms of the core economic infrastructure of BiH and increase road capacity and safety on this North-South corridor. The project will shorten travel distances along the central part of the corridor and is thus expected to generate substantial benefits in terms of time savings, reduced accident rates, savings in vehicle operating costs and reduction of relative emissions. The project will also increase accessibility and promote regional as well as local economic development.

    Sector(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Proposed EIB finance (Approximate amount)

    EUR 300 million

    Total cost (Approximate amount)

    EUR 1000 million

    Environmental aspects

    If located within the EU, the project would fall under Annex I of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU and therefore be subject to an environmental impact assessment (EIA) procedure. As a potential candidate country to the EU, BiH has adopted the relevant EU Directives, including the EIA Directive (2014/52/EU). The entire Corridor Vc has been subject to a regulatory EIA procedure in BiH (divided in four lots with the corresponding EIAs), including public consultation at scoping and assessment stages. For the road section Konjic-Mostar North, a specific environmental impact assessment and a Waste Management Plan were prepared in 2016 and are currently updated under Western Balkans Investment Framework financed technical assistance (WBIF financed TA). Environmental and social aspects, management measures and procedures as well as alignments of the project with EIB Environmental and Social standards and provisions of the relevant EU Directives are to be reviewed during appraisal.

    Procurement

    The Bank will require the Promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Status

    Under appraisal - 9/12/2020

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Bosnia and Herzegovina Transport