Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200517
    Date de publication: 23 février 2021

    Promoteur – Intermédiaire Financier

    UAB VILNIAUS VANDENYS

    Lieu

    Description

    Financing of a multi-annual investment programme in water and sanitation in the City of Vilnius.

    Objectifs

    The proposed operation concerns the multiannual investment plan of Vilnius Water, and aims at enhancing the quality and security of water supply and wastewater collection and treatment. Investments are supposed to include rehabilitation of networks, metering replacement, rehabilitation and modernisation of the wastewater treatment plants (WWTP), water treatment and storage facilities, and information and communications technologies (ICT) process improvement and automation items.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 109 million

    Aspects environnementaux

    The project will contribute to ensuring compliance with key EU directives in the water sector notably the Urban Waste Water Treatment Directive (91/271/EEC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU and SEA Directive 2001/42/EC will be respected. The Promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the environmental impact assessment (EIA) for publication on its website. For any part of the project that may have an impact on a nature conservation site, the Promoter will be required to provide to the Bank information on the mitigating measures required to comply with the Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively).

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 31/03/2021

    Clause de non-responsabilité

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Mots-clés correspondants

    Lituanie Eau, assainissement