    Reference: 20210751
    Release date: 23 November 2022

    Promoter – Financial Intermediary

    ELETROPAULO METROPOLITANA ELETRICIDADE DE SAO PAULO SA

    Location

    Description

    This investment is an allocation of funds under the Enel Energy & Renewable framework loan, consisting of electricity distribution investments in Brazil. These aim to extend and modernise the network, add new renewable energy capacity to the network, reduce losses and improve quality and safety of supply.

    Objectives

    The project consists of the financing of the modernisation and extension of the Promoter's electricity distribution networks in the São Paulo region and of the installation of new remote control systems and protections of the grid, with the aim of increasing the its reliability, resilience and reducing the level of losses, leading to better quality and safety of energy supply. A portion of the investment will also enable the connection to additional renewable generation units.

    Sector(s)

    • Energy - Electricity, gas, steam and air conditioning supply

    Proposed EIB finance (Approximate amount)

    USD 200 million (EUR 188 million)

    Total cost (Approximate amount)

    USD 422 million (EUR 397 million)

    Environmental aspects

    The Bank reviewed the environmental and social capacity of the Promoter, including its organisation, processes and procedures, and deemed them to be good. Based on the information available, the programme is expected to have minor negative residual impacts and thus is acceptable for Bank financing from an environmental and social perspective. The Promoter undertakes to implement the project in accordance with the EIB's Environmental and Social Standards and in compliance with the national environmental legislation. Furthermore the programme does not entail components with significant, negative environmental and/or social impacts or requiring physical resettlement and/or impact on indigenous people in accordance with undertakings committed to under the Framework Loan 2020-0823. The Promoter undertakes not to allocate the Bank's funds to any components of the programme that require an environmental and social management plan (ESMP) before this has been sent for review to the satisfaction of the Bank.

    Procurement

    The concession to the Promoter was awarded in a transparent and internationally competitive manner, the programme is not subject to public procurement rules. The procurement procedures followed by the Promoter are suitable for the project and satisfactory to the EIB.

    Status

    Approved - 21/12/2022

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).