    Référence: 20200105
    Date de publication: 27 novembre 2020

    Promoteur – Intermédiaire Financier

    BAYERISCHE EISENBAHNGESELLSCHAFT MIT BESCHRAENKTER HAFTUNG

    Lieu

    Description

    Acquisition of about 110 new high capacity electric multiple units (EMUs) for S-Bahn Muenchen to replace life-expired vehicles, in support of an ongoing public transport capacity extension programme.

    Objectifs

    The project consists of the financing of the acquisition of new rolling stock (electric multiple units, or EMUs) estimated at about 110 vehicles and associated equipment for a public service contract to operate the rail passenger services on the S-Bahn network of Munich, Bavaria. The new fleet will complement the service improvements enabled by significant infrastructure works, in particular the enhancement of the tunnel through the city centre and the refurbishment of five sizeable stations. Together, these will allow increasing the service frequency and train length.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 1380 million

    Coût total (montant approximatif)

    EUR 2800 million

    Aspects environnementaux

    The investment proposed under the project does not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU (as amended by Directive 2014/52/EU) as manufacturing and use of rail rolling stock is not included in either list. The need for an environmental impact assessment (EIA) and/or assessment according to the Habitats Directive 92/43/EEC for associated facilities (e.g. maintenance workshops or depots), not included in the investment proposed but needed for the correct operation of the new rolling stock, will be analysed during the appraisal. Arrangements for the replacement or decommissioning of old rolling stock will be reviewed during appraisal. All else equal, the project is expected to have a positive environmental impact by contributing to modal shift from road to railways.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 30/06/2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Transports