Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20190784
Date de publication: 12 mai 2020

Promoteur – Intermédiaire Financier

SYNDICAT INTERDEPARTEMENTAL POUR L'ASSAINISSEMENT DE L'AGGLOMERATION PARISIENNE

Lieu

Description

The project constitutes the continuation of the investment program of the SIAAP (INTERDEPARTMENTAL SYNDICATE FOR THE SANITATION OF THE PARIS AGGLOMERATION) for the upgrading of the largest wastewater treatment plant in the Paris region (Achères Seine Aval).

Objectifs

The project targets improved wastewater treatment and sludge treatment through the rehabilitation and upgrading of the primary settlers and the biogas plant in SIAAP's largest wastewater treatment plant with a capacity of 1.5 million cubic meters per day (combined flow of wastewater and storm water), as well as the construction of a large trunk sewer to prevent discharge of untreated sewage to Seine river.

Secteur(s)

  • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

EUR 250 million

Coût total (montant approximatif)

EUR 1000 million

Aspects environnementaux

The project aims at maintaining compliance with the Urban Wastewater Treatment Directive 91/271/EC and Water Framework Directive 2000/60/EC. Several of the construction schemes included in the project might fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. Environmental Impact Assessment procedures are carried out where required by the competent authorities and mitigating measures are applied as appropriate. Where appropriate, the requirements of the Habitats and Birds Directives (92/43/EEC and 2009/147/EC) are applied. The Bank's appraisal will focus on the Promoter's environmental management capacity to properly apply these EU Directives.

Passation des marchés

The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU), with publication of tender notices in the EU Official Journal, as and where required.

Statut

Signé - 10/12/2020

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

France Eau, assainissement