    Référence: 20180290
    Date de publication: 15 janvier 2019

    Promoteur – Intermédiaire Financier

    EDP RENOVAVEIS SA

    Lieu

    Description

    The project concerns the construction and operation of three wind farms located in Portugal with a total capacity of 96 MW.

    Objectifs

    The project will support EU and national targets for renewable energy generation, and contributes to the security of energy supply and environmental objectives. The project will further contribute the EIB's lending priority policy on social cohesion, renewable energy and climate action.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 47 million

    Coût total (montant approximatif)

    EUR 96 million

    Aspects environnementaux

    Windfarms falls under Annex II of Directive 2011/92/EU (as amended by Directive 2014/52/EU) according to which the Member States shall determine whether the project shall be made subject to an assessment based on defined criteria. According to national legislation, windfarms exceeding certain criteria are subject to a mandatory Environmental Impact Assessment (EIA). This was the case for two of the three windfarms. The environmental studies for the EIA process were undertaken and the competent authorities have granted approval containing requirements to mitigate environmental impacts accordingly. Residual impacts were classified of small magnitude and low significance.

    Passation des marchés

    The project will be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC c.q. 2014/25/EU hence private sector procurement procedures applied. Equipment and works were purchased through multi contracts such as one for supply and installation of turbines, others for infrastructure works (Balance of Plant), electrical works etc.

    Statut

    Signé - 27/11/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Énergie