Release date
2 January 2023
Status
Reference
Approved | 08/12/2022
20190589
Project name
Promoter - financial intermediary
T MURES-OGRA-C TURZII A3 HIGHWAY (SPL 2015-0712)
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE - SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 33 million
EUR 529 million
Location
Sector(s)
Description
Objectives

The project concerns the construction of a new 51.8 km 2x2 lanes motorway section of the A3 motorway between the towns of Targu Mures, Ogra and Campia Turzii and a 4.7 km national 2x2 link road to the city of Targu Mures.

The aim is to improve mobility on the trans-European network (TEN-T) core road infrastructure, reduce travel times, vehicle operating costs and accident levels. The project will also improve the quality of life for local residents along the existing DN15 (E60), by reducing their exposure to air and noise pollutants.

Additionality and Impact

The Project is located on the Core TEN-T Network in a Cohesion region of Romania. The Project addresses the market/network failures related to accessibility along the Core TEN-T Network.

The new link will reduce travel times, vehicle operating costs, accident levels and exposure of inhabitants to air and noise pollutants and improve the quality of life for local residents along the existing DN15 (E60).

The Project will serve local, regional and international traffic demand. The project has benefited from JASPERS and PASU Technical Assistance to the Managing Authority.

Romania will benefit from the advantageous financial conditions offered by EIB, including long tenors (up to 25 years) and attractive interest rates. Such conditions will allow Romania for a considerable financial flexibility in the implementation of its transport infrastructural investments (including the T Mures-Ogra-C Turzii A3 highway) and contribute to the effective absorption of EU funds.

Environmental aspects
Procurement

The EU and Romania national legal procedures have been properly followed in the project preparation and implementation. EIA study has been completed and the competent authorities have issued environmental decisions and building permits.

The Promoter is a public contracting authority subject to the relevant EU directives. The procurement is following the principles of the Directives 2014/24/EC and 89/665/EC. The project works and service contracts have been procured through open tenders after international publication in the OJEU.

Related projects

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - T MURES-OGRA-C TURZII A3 HIGHWAY (SPL 2015-0712) - Completari la studiul de evaluare adecvata
Publication Date
26 Nov 2022
Document language
Main Topic
Lending
Document Number
159073764
Document Focus
Environmental Information
Project Number
20190589
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - T MURES-OGRA-C TURZII A3 HIGHWAY (SPL 2015-0712) - Studiu de Evaluare Adecvata
Publication Date
11 Jan 2023
Document language
Main Topic
Lending
Document Number
158982337
Document Focus
Environmental Information
Project Number
20190589
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - T MURES-OGRA-C TURZII A3 HIGHWAY (SPL 2015-0712)
Publication Date
11 Jan 2023
Document language
Main Topic
Lending
Document Number
123369489
Document Focus
Environmental Information
Project Number
20190589
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - T MURES-OGRA-C TURZII A3 HIGHWAY (SPL 2015-0712) - Raport privind impactul asupra mediului - Rezumat Fara Caracter Tehnic
Publication Date
11 Jan 2023
Document language
Main Topic
Lending
Document Number
158979650
Document Focus
Environmental Information
Project Number
20190589
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications