    Signature(s)

    Amount
    € 100,000,000
    Countries
    Sector(s)
    Ireland : € 100,000,000
    Energy : € 100,000,000
    Signature date(s)
    12/03/2026 : € 4,169,135.61
    12/03/2026 : € 95,830,864.39

    Summary sheet

    Release date
    12 November 2025
    Status
    Reference
    Signed | 12/03/2026
    20240743
    Project name
    Promoter - financial intermediary
    PROJECT DOLMEN SOLAR PV
    POWER CAPITAL RENEWABLE ENERGY LTD
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 100 million
    EUR 250 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The project will finance the construction of four solar photovoltaic plants (PV) totalling 395 MWp in Ireland.

    Renewable power plants contribute to progress on the national and EU energy and climate goals, namely decarbonise electricity production in the EU and decrease the reliance on fossil fuels. The project is therefore eligible under Article 309 point (c) common interest.

    Additionality and Impact

    The project concerns the development and operation of four solar PV plants in Ireland, with a total capacity of 395MWp. The project increases the renewable energy generation capacity in Ireland and contributes to national and EU 2030 climate objectives.


    The financing of this project is in line with the Bank's lending priority objectives on Renewable Energy as well as on Climate Action and Environmental Sustainability.


    The project produces electricity from low carbon sources (solar photovoltaic ("PV") plants), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and other air pollution (compared to fossil-fuel generation).

    The project's revenues will be supported through a two-sided contracts for differences support scheme (RESS-3 and RESS-4), with a merchant tail.


    In terms of project results, the projects are expected to have a positive economic rate of return, considering the economic value of the electricity generated. Therefore, the project is expected to generate a positive broader social benefit by generating clean and renewable power at a cost (LCOE) reasonably below the cost alternatives in Ireland. The Project is expected to be supported by policies set in place by the promoter, who has adequate capacity in building such project and a good track record on renewable energy projects in Ireland.


    The Bank will provide a meaningful part of the overall financing needs of the project through a senior debt facility to achieve construction and operation of the assets. The Bank provides expertise in structuring and lending to renewable energy projects, applying project finance principles well tested in other transactions. This will improve the structuring of the operation through close cooperation with the promoter and the commercial lenders.

    Environmental aspects
    Procurement

    Solar PV plants fall under the Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending the EIA Directive 2011/92/EU), therefore leaving it to the competent authority to determine according to Annex III of the said Directive whether an Environmental Impact Assessment (EIA) is required. Given that China largely dominates the solar panel market, and media have reported the risk of child labour, enhanced due diligence will be applied in line with the EIB's Environmental & Social Standards. The project is expected to contribute to Climate Action and Environmental Sustainability objectives, in particular to climate change mitigation and pollution prevention and control.

    The promoter is a private company and the schemes envisaged for this operation are market-based renewable energy projects, which do not enjoy any special or exclusive rights. Therefore, private sector procurement procedures should apply.

    Milestone
    Under appraisal
    Approved
    Signed
    10 February 2026
    12 March 2026
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - PROJECT DOLMEN SOLAR PV
    Publication Date
    16 Jan 2026
    Document language
    Main Topic
    Lending
    Document Number
    256804982
    Document Focus
    Environmental Information
    Project Number
    20240743
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications